 For more information on Internet Seminars, please contact:
 |
|
CLU-IN's ongoing series of Internet Seminars are free, web-based slide presentations with a companion audio portion. We provide two options for accessing the audio portion of the seminar: by phone line or streaming audio simulcast. More information and registration for all Internet Seminars is available by selecting the individual seminar below. Not able to make one of our live offerings? You may also view archived seminars below. [En español]
|
|
|

> Upcoming Live Seminars
Some comments
we've received about Internet Seminars. . .
|
July 2008 |
 |
|
|
August 2008 |
 |
|
|
September 2008 |
 |
Sunday
|
Monday
|
Tuesday
|
Wednesday
|
Thursday
|
Friday
|
Saturday
|
|
|
1
|
2
|
3
|
4
|
5
|
6
|
|
7
|
8
|
9
|
10
|
11
|
12
|
13
|
|
14
|
15
|
16
|
17
|
18
|
19
|
20
|
|
21
|
22
|
23
|
24
|
25
|
26
|
27
|
|
28
|
29
|
30
|
|
|
|
|
A Systematic Approach for Evaluation of Capture Zones at Pump and Treat Systems
|
|
A Systematic Approach for Evaluation of Capture Zones at Pump and Treat Systems presents a systematic approach for the evaluation of capture zones at pump and treat systems, and provides an overview of a recently published USEPA document on the topic (EPA 600/R-08/003, January 2008). The target audience for the course is project managers who review those analyses and/or make decisions based on these types of analyses. This course will highlight: - The importance of capture zone analysis during ground water remediation, particularly for sites requiring containment
- Key concepts of capture, such as "target capture zones" and "converging lines of evidence"
- Typical errors made in capture zone analysis
In addition, steps associated with a systematic approach for capture zone analysis will be discussed. These steps include the following:- Step 1: Review site data, site conceptual model, and remedy objectives
- Step 2: Define site-specific Target Capture Zone(s)
- Step 3: Interpret water levels
- Potentiometric surface maps (horizontal) and water level difference maps (vertical)
- Water level pairs (gradient control points)
Step 4: Perform calculations (as appropriate based on site complexity)- Estimated flow rate calculation
- Capture zone width calculation
- Modeling (analytical and/or numerical) to simulate water levels, in conjunction with particle tracking and/or transport modeling
- Step 5: Evaluate concentration trends
- Step 6: Interpret actual capture based on steps 1-5, compare to Target Capture Zone(s), and assess uncertainties and data gaps
Examples will be used to demonstrate key aspects of capture zone analysis.
|
|
 Jul 21, 2008 1:00PM-3:00PM EDT 17:00-19:00 GMT More Information & RegistrationContent Questions? Call Linda Fiedler at 703-603-7194
Technical Problems? Leave us a comment
Already Registered and Trying to Check In? Please refer to your email registration confirmation from balent.jean@epa.gov for more information
Already Registered and Trying to Cancel? Please refer to your email registration confirmation from
balent.jean@epa.gov for information on cancelling your registration or cancel online using your registration ID
 |

> Seminars sponsored by the Interstate Technology and Regulatory
Council
ITRC Vapor Intrusion Pathway: A Practical Guideline
|
|
Vapor Intrusion is the migration of volatile chemicals from the subsurface into overlying buildings. Volatile chemicals may include volatile organic compounds, select semi-volatile organic compounds, and some inorganic analytes, such as elemental mercury and hydrogen sulfide. Degradation of the indoor air quality causes a great deal of fear and anxiety among building occupants, business, and other property owners. Vapor intrusion has become a significant environmental issue for regulators, industry leaders, and concerned residents. Vapor intrusion requires three components: the source, an inhabited building, and a pathway from the source to the inhabitants.
The ITRC Vapor Intrusion Team is composed of representatives from 19 states environmental agencies, 12 environmental companies, and four federal agencies (including EPA). This team developed the ITRC Technical and Regulatory Guidance document Vapor Intrusion Pathway: A Practical Guideline (VI-1, 2007), companion document Vapor Intrusion Pathway: Investigative Approaches for Typical Scenarios (VI-1A, 2007), this Internet-based training course, and a two-day classroom training course to be used by regulatory agencies and practitioners alike. For more information about the in-depth classroom training course, please visit the ITRC Classroom Training webpage. This Internet-based training course provides an overview of the vapor intrusion pathway; summarizes introductory information on the framework (evaluation process), investigative tools, and mitigation approaches; and utilizes typical scenarios to illustrate the process.

|
|
 Jul 29, 2008 2:00PM-4:15PM EDT 18:00-20:15 GMT More Information & RegistrationContent Questions? Call the ITRC Training Program at 402-201-2419
Technical Problems? Leave us a comment
Already Registered and Trying to Check In? Please refer to your email registration confirmation from training@itrcweb.org for more information
Already Registered and Trying to Cancel? Please refer to your email registration confirmation from
training@itrcweb.org for information on cancelling your registration or cancel online using your registration ID
 |
ITRC Decontamination and Decommissioning of Radiologically-Contaminated Facilities
|
|
The decontamination and decommissioning (D&D) of radiologically-contaminated facilities presents numerous challenges. Many tasks are involved, each of which requires adherence to a complex array of federal and state regulations and policies, attention to health and safety issues for workers and the public, monitoring and management of schedules and costs, and interaction with a potentially large number of stakeholders who have an interest in the present activities and future plans for sites undergoing D&D. Since large-scale D&D operations at nuclear facilities began in the 1970s, one of the most noticeable advances has been dramatic decreases in decommissioning cost. This change is the result of a combination of accumulated decommissioning operational experience reducing the high initial cost estimates (which were high due to uncertainties and poorly defined boundaries), evolution of regulatory guidance, and continuously-developing technologies.
A large body of knowledge has already been accumulated on D&D operations. At the present time, approximately 90 commercial power reactors, 250 research reactors, 100 mines, 5 reprocessing facilities, and 14 fuel fabrication plants have been retired from operation, with some having been fully dismantled. In addition, the largest environmental cleanup projects ever undertaken are in progress or have recently been completed at several large DOE facilities in the nuclear weapons complex. Technologies developed for the D&D portions of these cleanups are part of the lessons learned from these projects.
This training introduces regulators, cleanup contractors, site owners/operators, and technology providers to ITRC's Technical/Regulatory Guidance, Decontamination and Decommissioning of Radiologically-Contaminated Facilities (RAD-5, 2008), created by ITRC's Radionuclides Team. The curriculum is composed of four modules as follows:
Module 1: Introduction and Regulatory Basis for D&D
Module 2: Factors for Implementing D&D
Module 3: Preliminary Remediation Goal (PRG) Calculators
Module 4: Case Studies and Lessons Learned

|
|
 Aug 5, 2008 2:00PM-4:15PM EDT 18:00-20:15 GMT More Information & RegistrationContent Questions? Call the ITRC Training Program at 402-201-2419
Technical Problems? Leave us a comment
Already Registered and Trying to Check In? Please refer to your email registration confirmation from training@itrcweb.org for more information
Already Registered and Trying to Cancel? Please refer to your email registration confirmation from
training@itrcweb.org for information on cancelling your registration or cancel online using your registration ID
 |
|

http://cluin.org/studio/seminar.cfm
Page Last Modified: April 16, 2007
 |