State Coalition for Remediation of Drycleaners Site Profiles
Park Avenue Cleaners, Richardson, Texas
Description
|
Park Avenue Cleaners is an active PCE drycleaning facility that has been in operation since 1975. The facility is located in a shopping center in a commercial retail setting. PCE and TCE were identified in soil and groundwater during investigations conducted in 1998. The contaminant source areas are the soils beneath the facility floor slab and a utility trench. |
Contaminants
Contaminants present and the highest amount
detected in both soil and groundwater.
Contaminant | Media | Concentration (ppb) | Nondetect |
---|---|---|---|
cis-1,2-Dichloroethene | groundwater | 56 ppb | |
cis-1,2-Dichloroethene | soil | 56 ppb | |
Tetrachloroethene (PCE) | groundwater | 470 ppb | |
Tetrachloroethene (PCE) | soil | 44,590 ppb | |
Trichloroethene (TCE) | groundwater | 150 ppb | |
Trichloroethene (TCE) | soil | 940 ppb | |
trans-1,2-Dichloroethene | groundwater | 4 ppb | |
xylenes | groundwater | 1 ppb |
Site Hydrology
Deepest Significant Groundwater Contamination: | 12ft bgs | |
Plume Size: | ||
Average Depth to Groundwater: | 9ft |
Lithology and Subsurface Geology
clay Depth: 0-8ft bgs 8ft thick Conductivity: 0.09ft/day Gradient: 0.08ft/ft |
||
weathered limestone Depth: 8-12ft bgs 4ft thick |
Pathways and DNAPL Presence
Groundwater Sediments Soil DNAPL Present |
Remediation Scenario
Cleanup
Goals: |
Soil: PCE = 5,000 µg/kg; TCE = 5,000 µg/kg Groundwater: PCE = 500 µg/l; TCE = 500 µg/l |
Technologies
In Situ Chemical Oxidation |
Why the technology was selected: Date implemented: Final remediation design: Results to date: Next Steps: |
Costs
Cost
for Assessment: |
No cost data was available. | |
Cost
for Operation and Maintenance: |
||
Total
Costs for Cleanup: |
Contacts
Merrie Smith Texas Commission on Environmental Quality (TCEQ) Voluntary Cleanup Program 12100 Park Circle, Bldg. D Austin, Texas 78753 David Lent IVI Environmental, Inc. 105 Corporate Park Drive White Plains, New York 10604 Phone: 914-694-9600 |