State Coalition for Remediation of Drycleaners Site Profiles
Former Prestonwood Specialty Cleaners, Dallas, Texas
Description
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Prestonwood Specialty Cleaners formerly operated in a one-story shopping center. Investigations conducted in 1995 identified this former operation as a contaminant source. Remediation Status: Site closed |
Contaminants
Contaminants present and the highest amount
detected in both soil and groundwater.
| Contaminant | Media | Concentration (ppb) | Nondetect |
|---|---|---|---|
| cis-1,2-Dichloroethene | groundwater | ||
| 1,1-Dichloroethene | groundwater | ||
| Tetrachloroethene (PCE) | groundwater | ||
| Tetrachloroethene (PCE) | soil | ||
| 1,1,1-Trichloroethane | groundwater | ||
| Trichloroethene (TCE) | groundwater | ||
| trans-1,2-Dichloroethene | groundwater |
Site Hydrology
| Deepest Significant Groundwater Contamination: | 25ft bgs | |
| Plume Size: | Plume Length: 120ft Plume Width: 70ft |
|
| Average Depth to Groundwater: | 5ft |
Lithology and Subsurface Geology
| Fill material, clay lenses, limestone Gradient: 0.13ft/ft |
Pathways and DNAPL Presence
|
|
Remediation Scenario
Cleanup
Goals: |
Groundwater: PCE = 500 µg/l Soil: PCE = 50,000 µg/kg |
Technologies
Ex Situ Soil Removal |
Why the technology was selected: Date implemented: Final remediation design: Results to date: Next Steps: |
Costs
Cost
for Assessment: |
No costs were available. | |
Cost
for Operation and Maintenance: |
||
Total
Costs for Cleanup: |
Lessons Learned
| 1. Fracturing at high pressures resulted in unseating of straddle packers at some locations. |
Contacts
| Joe Bell Texas Commission on Environmental Quality (TCEQ) Voluntary Cleanup Program 12100 Park Circle, Bldg. D Austin, Texas 78753 Contractor: Dames & Moore 5151 Beltline Road, Suite 700 Dallas, Texas 75240 Phone (972) 980-4961 |



