State Coalition for Remediation of Drycleaners Site Profiles
City Hall (Former Swift Cleaners), Jacksonville Beach, Florida
Description
|
The City Hall site is located in Jacksonville Beach, approximately 1,000 feet west of the Atlantic Ocean. The surrounding area is comprised of mostly commercial establishments. The former drycleaning business (Swift Cleaners) operated at this site from January 1917 until December 1962. Based upon the typical drycleaning processes during the early period of operation, it is likely that the facility originally used petroleum-based products and converted to PCE at a later date.
The City of Jacksonville Beach purchased the property in 1963. The former Swift Cleaners building was demolished and the Jacksonville Beach City Hall was built on the site.
In 1998, the City Hall building was demolished. Currently, a Walgreens drug store and a restaurant are located on the site. The former Swift Cleaners building was located in what is currently the parking lot for the drug store. The approximate location of the building was determined by reviewing historical aerial photographs and Sanborn maps. Remediation Status: In groundwater monitoring |
Contaminants
Contaminants present and the highest amount
detected in both soil and groundwater.
Contaminant | Media | Concentration (ppb) | Nondetect |
---|---|---|---|
cis-1,2-Dichloroethene | groundwater | ||
cis-1,2-Dichloroethene | soil | ||
Tetrachloroethene (PCE) | groundwater | ||
Tetrachloroethene (PCE) | soil | ||
Trichloroethene (TCE) | groundwater | ||
Trichloroethene (TCE) | soil | ||
Vinyl Chloride | groundwater |
Site Hydrology
Deepest Significant Groundwater Contamination: | 40ft bgs | |
Plume Size: | Plume Length: 600ft Plume Width: 170ft Plume Thickness: 36ft |
|
Average Depth to Groundwater: | 4.18ft |
Lithology and Subsurface Geology
very fine-grained sands interbedded with clayey, silt zones Depth: 0-30ft bgs 30ft thick Conductivity: 14.01ft/day Gradient: 0.0018ft/ft |
||
silty sand interbedded with clayey, silt zones Depth: 30-50ft bgs 20ft thick |
Pathways and DNAPL Presence
Groundwater Sediments Soil DNAPL Present |
Vapor Intrusion Pathway
Has the potential for vapor intrusion (VI) been evaluated? |
No |
|
Has a vapor mitigation system been installed? |
No | |
Additional VI Information: |
Contaminated soil was excavated at the site. |
Remediation Scenario
Cleanup
Goals: |
Groundwater- Maximum Contaminant Levels (MCLs); PCE= 3 ug/l, TCE= 3 ug/l, cis 1,2-DCE= 70 ug/l, VC= 1 ug/l Soils - leachability based Cleanup Target Levels (CTLs), PCE= 30 ug/kg, TCE = 30 ug/kg, TRPH = 340 mg/kg. |
|
Remedy Level: |
Full Scale Remedy |
Technologies
In Situ Biostimulation |
Why the technology was selected: Date implemented: Final remediation design: Results to date: Next Steps: |
|
In Situ Chemical Oxidation |
Why the technology was selected: Date implemented: Final remediation design: Results to date: Next Steps: Cost to Design and Implement: |
|
Ex Situ Soil Removal |
Why the technology was selected: Date implemented: Final remediation design: Results to date: Next Steps: Cost to Design and Implement: |
Costs
Cost
for Assessment: |
$72,000 | |
Cost
for Operation and Maintenance: |
$7,700 (Annual Monitoring) | |
Total
Costs for Cleanup: |
Lessons Learned
1. Although historical aerial photographs and Sanborn maps were useful in determining the location of prior drycleaning facility, nothing was known concerning the equipment layout at the facility or any of the operating details. At sites like this, a soil gas survey is a useful tool in locating contaminant source areas. 2. Removal of contaminated soil has made a significant difference to contaminant concentrations within the groundwater at this site. |
Contacts
Aaron Cohen Florida Dept. of Environmental Protection Bureau of Waste Cleanup, MS 4500 2600 Blair Stone Road Tallahassee, Florida 32399 850-245-8974 Aaron.Cohen@dep.state.fl.us Kelly Baltz, P.E. Golder Associates 9428 Baymeadows Road, Suite 400 Jacksonville, FL 32256 Phone: (904)-363-3430 Kelly.Baltz@golder.com |
Site Specific References
Contamination Assessment Report: 2000 Remedial Action Plan for excavation & chemical oxidation: November 2001. Chemical Oxidation Pilot Report: June 2002. Source Removal Completion Report: July 2004. Biostimulation Injection Reports: 2005 - 2008. Modified Active Soil Gas Sampling Report: 2007 Groundwater Monitoring Reports: 2002 - 2009. 1. Harding ESE, Ic. Remedial Action Plan-November 15, 2001 2. Harding ESE Inc. Chemical Oxidation Report- June 6, 2002 3. Harding ESE, Inc. 1st Quarterly Monitoring Report- November 5, 2002 4. Golder Associates Inc. Additional soil and Groundwater Sampling Report - December 19, 2003 5. Golder Associates Inc. Source Removal Completion Report -July 19, 2004 6. Golder Associates Inc. Year 2- Annual Groundwater Monitoring Report -October 14, 2004 |